欢迎您浏览济南巨野河福华建材厂,主营:济南腻子粉,济南石膏粉,济南抹面砂浆等建筑装饰材料,大量批发,欢迎咨询。

专注绿色建筑装饰材料

经营管理理念:让客户用的放心!

24小时服务热线:

13864111871

当前位置: 首页 - 新闻动态 > 公司新闻
公司新闻
联系我们

济南福华建材厂

联系人:吴老师 

电话:13864111871 

手机:13864111871
          0531-81901300
地址:山东省济南市高新开发区巨野河办事处山圈村西


外保温系统砂浆的产品特点!

来源:https://www.jnfhjc.com 日期:2019-04-26 发布人:

  外保温系统砂浆是一种聚合物增强的水泥基预配制干混柔性粘结砂浆。它是以水泥、石英砂、德国进口聚合物胶粘料配以多种添加剂混合机均混而成,和掺入 传统建筑胶的砂浆相比具有优良的柔韧性和粘结性能,以及良好的抗下垂性、保水性、耐水性以及简单方便的可操作性,增强了基材与EPS保温板之间的粘结强 度,增强了拉伸强度,防止空鼓。直接加水,施工方便,操作简单,工效高。无毒、无嗅、不燃、不伤人体,不含挥发性溶剂,属绿色环保产品。

  External thermal insulation system mortar is a kind of polymer reinforced cement-based precast dry-mixed flexible bonding mortar. It is made of cement, quartz sand, German imported polymer adhesives mixed with various additives. Compared with the mortar mixed with traditional building adhesives, it has excellent flexibility and bonding performance, as well as good droop resistance, water retention, water resistance and simple and convenient maneuverability. It enhances the bonding strength between the base material and EPS insulation board, and enhances the tensile strength. Degree, prevent empty drum. Direct water addition, convenient construction, simple operation, high efficiency. Non-toxic, odorless, non-flammable, non-harmful to human body, no volatile solvents, is a green environmental protection product.
  适用于外墙外保温系统和外墙内保温系统上EPS 聚苯乙烯保温板、XPS聚苯乙烯挤塑板、GRC板、陶粒板和水泥板与混凝土,砖砌块和加气块等基材的粘结。同时也适用于收缩率较大的保温墙面粘贴面砖和粘贴面比较光滑的薄型大理石、石膏板等材料的粘贴。平整、坚固、清洁、干燥。对于新建工程,墙面的混凝土残渣和脱模剂养护荆必须清理干净,墙面平整度较差部分应剔凿或修补,表面疏松处必须剔除,新抹灰的基层要以过硬化干燥后方可施工。
  It is suitable for bonding EPS polystyrene insulation board, XPS polystyrene extrusion board, GRC board, ceramsite board and cement board with concrete, brick block and aerator on external and internal insulation system. At the same time, it is also suitable for the thermal insulation wall with larger shrinkage and the thin marble and gypsum board with smoother surface. Smooth, firm, clean and dry. For new construction projects, the concrete residue and release agent of the wall must be cleaned up, the parts with poor smoothness of the wall should be chiseled or repaired, the loose parts of the surface must be removed, and the newly plastered base should be hardened and dried before construction.
  保温粘结砂桨条粘法:先用齿状镘刀将搅拌好的外保温系统砂浆胶粘剂均匀地涂抹在聚苯板或挤塑板上,然后用齿状抹子在粘结砂浆上面梳理出条状纹,将保温板粘贴在墙面上,轻柔 均匀地按压板面使之粘结牢固,随时用2m靠尺检查平整度和垂直度。粘板时注意清除板边溢出的砂桨,使板与板之间无碰头灰。点框法:用抹灰刀将搅拌好的外保 温系统砂浆胶粘剂均匀涂抹在保温板边缘上形成边框,然后在板面上均匀分布5个高于边框的粘结点,后按上述方法将聚苯板或挤塑板粘到墙面上用靠尺靠平。设 计要求采用机械铆固件固定聚苯板或挤塑板时,铆固件安装应少在粘结砂浆使用3天以后。
济南抹面砂浆
  Thermal insulation bonding sand paddle sticking method: first, mix the mortar adhesive of external insulation system evenly on the polyphenyl board or extruded board with toothed trowel, then comb out the stripes on the bonded mortar with toothed plaster, paste the insulation board on the wall, press the board surface gently and evenly to make the bonding firm, check the flatness and verticality with 2m ruler at any time. Attention should be paid to removing the overflowing sand paddles at the edge of the board so that there is no contact ash between the board and the board. Point-frame method: The mortar adhesives of external thermal insulation system stirred by plastering knife are evenly applied on the edge of thermal insulation board to form a border, then five bonding points higher than the border are evenly distributed on the board surface. Finally, according to the above method, the polyphenyl board or the extruded board are bonded to the wall surface and leveled with a ruler. The design requires that when mechanical riveting firmware is used to fix polyphenyl board or extruded board, the riveting firmware shall be installed at least after 3 days of use of bonded mortar.
  施工温度大于5℃以上。严禁私自添加砂子、水泥及其它添加剂。O℃以下宜采用防冻型(为保证整个体系的稳定性,不推荐冬施)。拌制好的砂浆应在2小时内用完,已凝固硬化的砂桨不准再用。储运要防潮防晒。
  The construction temperature is above 5 C. It is strictly forbidden to add sand, cement and other additives without authorization. The freeze-proof type should be adopted below O C (winter application is not recommended to ensure the stability of the whole system). Mixed mortar should be used up within 2 hours, and solidified propeller should not be reused. Storage and transportation should be moistureproof and sunscreen.