欢迎您浏览济南巨野河福华建材厂,主营:济南腻子粉,济南石膏粉,济南抹面砂浆等建筑装饰材料,大量批发,欢迎咨询。

专注绿色建筑装饰材料

经营管理理念:让客户用的放心!

24小时服务热线:

13864111871

当前位置: 首页 - 新闻动态 > 公司新闻
公司新闻
联系我们

济南福华建材厂

联系人:吴老师 

电话:13864111871 

手机:13864111871
          0531-81901300
地址:山东省济南市高新开发区巨野河办事处山圈村西


建筑工程中粉刷砂浆的使用是不可缺少的

来源:https://www.jnfhjc.com 日期:2022-06-16 发布人:

现如今城市的建设在不断的发展,对于建筑的施工种类要求也越来越多,其中粉刷砂浆的使用是不可缺少的,关于他的使用方法下面小编讲几点以供参考。
Nowadays, with the continuous development of urban construction, there are more and more requirements for the construction types of buildings, among which the use of plastering mortar is indispensable. The following is a few points about his use methods for reference.
1、基材表面洁净牢固,清除砌块表面的灰尘、油脂、颗粒等一切影响粘结性能的松散物。
1. The surface of the base material shall be clean and firm, and the dust, grease, particles and other loose matters affecting the bonding performance on the block surface shall be removed.
2、施工前,普通砖、空心砖应提前浇水湿润,含水率宜为10~15%;灰砂砖,粉煤灰砖含水率宜为5~8%。待砌块表面无明水后,才能进行砌筑工序。
2. Before construction, ordinary bricks and hollow bricks shall be watered in advance with a moisture content of 10 ~ 15%; The moisture content of lime sand brick and fly ash brick should be 5 ~ 8%. When there is no open water on the block surface, the masonry process can be carried out.
3、粉刷砂浆应随拌随用,不得将粉刷砂浆放在水中浸泡,应采用机械拌合。
3. The plastering mortar shall be used as soon as it is mixed. The plastering mortar shall not be soaked in water, but shall be mixed mechanically.
4、拌和粉刷砂浆的水必须用洁净水,灰水比1:0.12(使用1000公斤砂浆,配120公斤洁净水),拌合时间自投料完毕算起搅拌3~5分钟。让砂浆与水充分拌和至没有结团块状为止,即可施工。
4. Clean water must be used for mixing and plastering mortar, with cement water ratio of 1:0.12 (1000 kg mortar and 120 kg clean water). The mixing time is 3 ~ 5 minutes from the completion of feeding. Allow the mortar and water to be fully mixed until there are no lumps.
济南抹面砂浆
5、用锯齿镘刀将砌筑砂浆满批在砌块的砌筑面上,施工厚度5mm~10mm即可。
5. Use a saw tooth trowel to fully batch the masonry mortar on the masonry surface of the block, and the construction thickness is 5mm ~ 10mm.
6、砌块砌筑完毕后,应立即清除砌块表面多余的浆料。
6. After the completion of block masonry, the excess slurry on the block surface shall be removed immediately.
7、济南抹面砂浆厂家提醒大家,如果施工期间高气温超过30℃,则调好的浆料必须在拌成后3小时内使用完毕。
7. Jinan plastering mortar manufacturer reminds everyone that if the high temperature exceeds 30 ℃ during construction, the adjusted slurry must be used within 3 hours after mixing.
8、粉刷砂浆在常温下即可硬化,通常室内施工无须洒水养护,而在高温干燥天气下,需洒水养护,确保强度的稳定。
8. The plastering mortar can be hardened at normal temperature. Generally, indoor construction does not need to be watered for curing. However, in high-temperature and dry weather, it needs to be watered for curing to ensure the stability of strength.
以上就是今天为大家分享的关于问题的相关内容,希望对大家能有所帮助,想要了解更多内容可以电话联系我们或者关注我们的网站https://www.jnfhjc.com
The above is the relevant content about the problem shared for you today. I hope it can help you. If you want to know more, you can contact us by phone or follow our website https://www.jnfhjc.com 。